Customization: | Available |
---|---|
After-sales Service: | 1year |
Automatic Grade: | Full-Automatic |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No
|
Item
|
Parameter
|
1
|
Flat tube width range
|
16-32mm
|
2
|
Flat tube thickness range
|
1.3-2.0mm
|
3
|
Core length range
|
50-680mm
|
4
|
Maximum number of bends
|
50
|
5
|
Bending angle
|
180°
|
6
|
Length
|
120~680mm
|
7
|
Number of bending segments
|
5~50
|
8
|
Work piece length feeding tolerance
|
L=±1.0mm
|
9
|
TBending processing error
|
The flatness is less than 1mm
|
With continuous progress anddevelopment in past two decades, now Bangwin machine is becoming the leading machinemanufacturer and solution supplier in HVAC and Refrigeration industry. Also we aredeeply involved into polyurethane foam insulation injection and spraying machine, metalwire and strip forming machine, car wheel rim machinery and cookware industryequipment, steel ball equipment, etc.We are good at turnkey project and real one-stop service. For turnkey project, we canhelp you for new workshop layout, investment plan, marketing research, cost and priceevolution, machine shipment, commissioning and the after-sale service. For reaone-stop service, one of our professional staff will always stand with you from technicalconsulting, order confirmation, production progress, quality control to final inspection,shipment, installation and commissioning.
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.